Logo

Energy Management Projects

  • Home
  • Energy Management Projects
Smart Energy

Energy Management Projects

Sarawak, East Malaysia

Refurbishment of chiller systems and associated works at Stadium Perpaduan Negara, aimed at improving cooling efficiency and extending equipment lifespan.

Green Facility Services Client
2019 - 2020 Duration

Perak & Sabah

Installation of air conditioning systems (IAC Sense) at HSBC branches including Downing Street, Ipoh, and Kota Kinabalu, ensuring efficient and consistent indoor climate control.

Appraisal Property Management Sdn Bhd Client
2020 (3 Months) Duration

Sarawak Region

Renovation and M&E upgrading works at Levels 4, 5, 6, 7, 8, and 9, Wisma Bapa Malaysia, Kuching.

Jabatan Kerja Raya (JKR) Client
2020 - 2022 Duration

All Region

Carry out a detailed inspection and provide a Detailed Energy Audit (DEA) report pertaining to equipment categorized under air-conditioning systems, lighting systems, air compressors, and other major energy-consuming equipment.

Commercial & Industrial Client
RMK - 11, RMK - 12, RMK –13 Duration

Rooftop Solar Installation at Nilai, Negeri Sembilan

6.49 kWp Capacity
RM 400 Savings
180 tonnes CO2 Offset

Rooftop Solar Installation at Bandar Puteri Jaya, Sungai Petani

5.31 kWp Capacity
RM 260 Savings
117 tonnes CO2 Offset

Rooftop Solar Installation at Mydin, N.Sembilan, Melaka & Johor

Mydin Client
7,165 kWp Capacity

Solar Installation at Gali Batu Depot, Singapore

456.84 kWp Capacity

Solar Panel installation at Kah Motor, Singapore

281.250 kWp Capacity

Solar Panel Installation at Weida Integrated Industries Sdn Bhd, Sarawak

Weida Integrated Industries Sdn Bhd Client
719.53 kWp Capacity

Solar Installation at Intel, Penang

Intel Client
46.87 kWp Capacity

Solar Installation at Puratos, Penang

13.625 kWp Capacity