Logo

Energy Management Projects

  • Home
  • Energy Management Projects
Smart Energy

Energy Management Projects

Sarawak, East Malaysia

Refurbishment of chiller systems and associated works at Stadium Perpaduan Negara, aimed at improving cooling efficiency and extending equipment lifespan.

Green Facility Services Client
2019 - 2020 Duration

Perak & Sabah

Installation of air conditioning systems (IAC Sense) at HSBC branches including Downing Street, Ipoh, and Kota Kinabalu, ensuring efficient and consistent indoor climate control.

Appraisal Property Management Sdn Bhd Client
2020 (3 Months) Duration

Sarawak Region

Renovation and M&E upgrading works at Levels 4, 5, 6, 7, 8, and 9, Wisma Bapa Malaysia, Kuching.

Jabatan Kerja Raya (JKR) Client
2020 - 2022 Duration

All Region

Carry out a detailed inspection and provide a Detailed Energy Audit (DEA) report pertaining to equipment categorized under air-conditioning systems, lighting systems, air compressors, and other major energy-consuming equipment.

Commercial & Industrial Client
RMK - 11, RMK - 12, RMK –13 Duration

Rooftop Solar Installation at Seksyen 5, Petaling Jaya

11.80 kWp Capacity
RM 700 Savings
316 tonnes CO2 Offset

Rooftop Solar Installation at Taman Pengkalan Jaya, Ipoh

4.72 kWp Capacity
RM 260 Savings
126 tonnes CO2 Offset

Rooftop Solar Installation at Meru Mutiara, Ipoh

5.85 kWp Capacity
RM 340 Savings
157 tonnes CO2 Offset

Rooftop Solar Installation at Permatang Pauh, Penang

5.90 kWp Capacity
RM 350 Savings
158 tonnes CO2 Offset

Rooftop Solar Installation at Taman Bukit Blossom,

14.04 kWp Capacity
RM 800 Savings
376 tonnes CO2 Offset

Rooftop Solar Installation at Taman Kuchai, Puchong

9.95 kWp Capacity
RM 600 Savings
266 tonnes CO2 Offset

Solar Installation at My Hotel, Brickfields KL

35.40 kWp Capacity

Trong, Perak

Solar Installation at West Coast Expressway Sdn Bhd (WCE)

30.09 kWp Capacity
RM 1,838 Savings
663 tonnes CO2 Offset

Taiping, Perak

Solar Installation at West Coast Expressway Sdn Bhd (WCE)

30.09 kWp Capacity
RM 1,838 Savings
663 tonnes CO2 Offset